Aktuelle News & Schlagzeilen

TechLED and 4-Wall prepare ASDA head office for Leeds Pride weekend

TechLED and 4-Wall prepare ASDA head office for Leeds Pride weekend
TechLED and 4-Wall prepare ASDA head office for Leeds Pride weekend

To demonstrate its support for Leeds Pride ASDA’s head office in Leeds city centre came out once again in the movement’s traditional bright rainbow colours, with the help of TechLED and 4-wall.

 

4-Wall’s Ben Perrin specified SGM Q7 wide-angled LED flood fixtures to be distributed evenly under the eaves of the building perimeter. For the building entrance, the tighter beam angle of SGM P5 architectural LED wash lights area, highlighted the features of the entryway.

 

ASDA’s supportive pigmentation was in place for three nights, aglow from 9 pm to 4 am Friday to Sunday. ASDA has a 3000-strong workforce on site which means access to the building exterior via the car park is fully restricted until after 5 pm. Extensive pre-planning by TechLED and the 4-Wall team was key to an unproblematic set up by the installation team.

 

Within two hours, the lighting fixtures were secured to the building. Two Lumen Radio CRMX transmitters linked the wireless LEDs to a Whole Hog 4 positioned in an outside control cabin, completing a fully outdoor installation.

 

www.techled.co.uk

 

© 1999 - 2024 Entertainment Technology Press Limited News Stories